|
Provision of Support Service for the Precast Factory Setting Up (Including factory layout design, production flow, equipment specification, tender documentation & coordination) for the Penang 2nd Bridge Project. 8400nos of Precast Segmental Box Girder shall be produced in this 40 acres factory. |
|
Sub-contract works for the production of 31 nos of 2.1m height precast post tensioned T-Beam for part of Duke Highway Project, Kuala Lumpur. (Completed) |
|
Sub-contract works for the production and installation of precast parapet for part of Duke Highway Project, Kuala Lumpur. (Completed) |
|
Provision of Project Development for a Malaysian company to venture into Thailand Low Cost Housing Scheme Project. (Partially Completed) |
|
Provision of precast IBS system (the SPB System™), design and sub-contract works for the precast element production & installation and all other superstructure works for Sekolah Menengah Kebangsaan Parit 3 project, Tanjung Karang. (Completed) |
|
Sub-contract for the IBS system development & coordination for the supply and erection of precast element for the construction of precast factory at Batu Kawan, Penang. (Completed) |
|
Sub-contract for the design and built precast IBS System (the SPB System™) for 1 Block 8 storey Hostel and 1 Block 8 storey Admin/Academic Building for Universiti Pertahanan Nasional Malaysia(UPNM) project, Sungai Besi, Kuala Lumpur. (Completed) |
|
Sub-contract for the design and built precast IBS System (the SPB System™) for 1 Block Administration and 1 Block Daily Care & Trauma Building for Hospital Universiti Sains Malaysia(HUSM) project, Kota Bahru, Kelantan. (Completed) |
|
Sub-contract to produce 2800 nos of precast segmental box girder for Penang 2nd Crossing Bridge Project for Buildcast-Persys JV, Penang. (On-Going) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SMK Taman Mutiara (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SMK Majidee Baru 2, Johor (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SMK Bandar Putri Jaya, Kedah (the SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SK Minden Height, Gelugor, Penang. (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SK Sg. Gelugor, Gelugor, Penang (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure for SMK Kompleks Tok Adis, Kuala Terengganu (Using SPB System™). (Completed) |
|
Sub-contract forspecialist design andbuilt IBS works for all superstructure work for SMK Kamunting Bakti, Kamunting, Perak (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for P2X, Toll Plaza, Penang (Using SPB System™). (Completed) |
|
Specialist design and supply for all Half Slab precast element SK Pendang 2, Pendang, Kedah (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SMK Alor Peroi, Besut, Terengganu (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for SMK Agama Jerlun, Kedah (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for Institut Kemahiran Belia Negara(IKBN) Tanah Merah, Kelantan (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for Kem Batalion Ke-2, Regimen Sempadan Batu Melintang, Kelantan (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for Politeknik Hulu Terengganu (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for Kompleks Mahkamah Baru, Kota Baru, Kelantan (Using SPB System™). (Completed) |
|
Sub-contract for specialist design and built IBS works for all superstructure work for Pembinaan Ibu Pejabat Polis Daerah(IPD) Pasir Mas, Kelantan (Using SPB System™). (Completed) |
|
|
|
Sub-contract for specialist design and built IBS works for all superstructure work for Sambungan Cadangan Pembangunan Semula Pasar Jalan Raja Bot di atas Lot 1707, Sebahangian Tanah Kerajaan(Rezab Jalan Haji Hussein dan Rezab Lorong Belakang) dan Lot 1221 hingga 1131, Mukim Kuala Lumpur (Using SPB System™). (On-Going) |
|
Sub-contract for specialist design and builtIBS works for all superstructure work for Cadangan Merekabentuk, Membina Dan Menyiapkan Fakulti Kejuruteraan Pembuatan, Universiti Teknikal Malaysia, Melaka(UTeM) (Using SPB System™). (Completed) |
|
|
|
Precast System Provider for Production, Installation & Structural Works and production of precast component for Cadangan Pembangunan Perumahan (Fasa 1) Yang Mengandungi 196 Unit Rumah Teres 2 Tingkat Dan 240 Unit Rumah Bandar Selangorku Di Atas Sebahagian Lot 85738 Mukim Rawang, Daerah Gombak For Mahsing Group (Using SPB System™). (On-Going) |
|
|
|
Sub-contract for specialist design and built IBS works for all superstructure work for Pembinaan Sekolah Baharu 18 Bilik Darjah dan Lain-lain Kemudahan Di SMK Serada, Kuala Terengganu, Terengganu (Using SPB System™). (On-Going) |
|
Sub-contract for Manufacture, Supply and Install Precast Component for Pembinaan Ibu Pejabat Polis Daerah Muallim, Perak (Using JKR SPB Catalogue). (On-Going) |